[{"@context":"http:\/\/schema.org\/","@type":"BlogPosting","@id":"https:\/\/wiki.edu.vn\/en\/wiki10\/line-19-beijing-subway-wikipedia\/#BlogPosting","mainEntityOfPage":"https:\/\/wiki.edu.vn\/en\/wiki10\/line-19-beijing-subway-wikipedia\/","headline":"Line 19 (Beijing Subway) – Wikipedia","name":"Line 19 (Beijing Subway) – Wikipedia","description":"From Wikipedia, the free encyclopedia Metro line of Beijing Subway Line 19 Other name(s) M19 \/ R3 (planned name) Status","datePublished":"2017-02-23","dateModified":"2017-02-23","author":{"@type":"Person","@id":"https:\/\/wiki.edu.vn\/en\/wiki10\/author\/lordneo\/#Person","name":"lordneo","url":"https:\/\/wiki.edu.vn\/en\/wiki10\/author\/lordneo\/","image":{"@type":"ImageObject","@id":"https:\/\/secure.gravatar.com\/avatar\/c9645c498c9701c88b89b8537773dd7c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c9645c498c9701c88b89b8537773dd7c?s=96&d=mm&r=g","height":96,"width":96}},"publisher":{"@type":"Organization","name":"Enzyklop\u00e4die","logo":{"@type":"ImageObject","@id":"https:\/\/wiki.edu.vn\/wiki4\/wp-content\/uploads\/2023\/08\/download.jpg","url":"https:\/\/wiki.edu.vn\/wiki4\/wp-content\/uploads\/2023\/08\/download.jpg","width":600,"height":60}},"image":{"@type":"ImageObject","@id":"https:\/\/upload.wikimedia.org\/wikipedia\/commons\/thumb\/0\/0c\/BJS_Line_19_icon.svg\/100px-BJS_Line_19_icon.svg.png","url":"https:\/\/upload.wikimedia.org\/wikipedia\/commons\/thumb\/0\/0c\/BJS_Line_19_icon.svg\/100px-BJS_Line_19_icon.svg.png","height":"50","width":"100"},"url":"https:\/\/wiki.edu.vn\/en\/wiki10\/line-19-beijing-subway-wikipedia\/","wordCount":2178,"articleBody":"From Wikipedia, the free encyclopediaMetro line of Beijing SubwayLine 19Other name(s)M19 \/ R3 (planned name)StatusIn operationTerminiStations10TypeRapid transitSystemBeijing SubwayOperator(s)Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[1]Depot(s)XingongRolling stock8-car Type A (CCD5034 and SFM80)Opened31\u00a0December 2021; 14 months ago\u00a0(2021-12-31)Line length20.9\u00a0km (13.0\u00a0mi)[2]CharacterFully underground[3]Track gauge1,435\u00a0mm (4\u00a0ft\u00a08+1\u20442\u00a0in)Operating speed100\u00a0km\/h (62\u00a0mph) (Phase 1)[4]Line 19 of the Beijing Subway (Chinese: \u5317\u4eac\u5730\u94c119\u53f7\u7ebf; pinyin: B\u011bij\u012bng D\u00ecti\u011b sh\u00edji\u01d4 h\u00e0oxi\u00e0n) is a rapid transit line in Beijing. It is 20.9\u00a0km (13.0\u00a0mi) in length and has 10 stations.[2] It is fully underground.[3]Description[edit]Phase 1 of Line 19 begins at Mudanyuan station in Haidian District and ends at Xingong station in Fengtai District.[5] Phase 1 of Line 19 is 20.9\u00a0km (13.0\u00a0mi)[2] in length with 10 stations.[6] The line was envisioned as a major relief line for the overcrowded Line 4 and more direct link to the Beijing Financial Street commercial area.The line uses 8-car type A rolling stock.[4][7]The trains have a maximum speed of 120\u00a0km\/h (75\u00a0mph). However the speed limit of the first phase, which runs under the dense city center is 100\u00a0km\/h (62\u00a0mph).[8][9] Phase II extensions north and south run through suburban areas and will be built to more generous alignments allowing for 120\u00a0km\/h (75\u00a0mph) operations.Opening timeline[edit]SegmentCommencementLengthStation(s)NameMudanyuan \u2014 Xingong31 December 2021[10]20.9\u00a0km (13.0\u00a0mi)[2]6Phase 1Beitaipingzhuang, Ping’anli, Taipingqiao, Jingfengmen30 July 2022[11]4Infill stations of Phase 1Stations (Phase I)[edit]Station Name[12]ConnectionsNearby Bus StopsDistancekm[13]LocationEnglishChineseMudanyuan\u7261\u4e39\u56ed\u00a010\u00a016 21 22 47 123 135 304 331 345\u5feb 425 508 510 579 601 606 618 620 645 653 658 \u591c4 \u591c90.0000.000HaidianBeitaipingzhuang\u5317\u592a\u5e73\u5e8416 22 47 88 123 135 300 300\u5feb 302 304 315 331 345\u5feb 361 368 387 425 508 510 579 604 606 618 620 645 671 694 695 847 883 885 886 889 921 \u591c4 \u591c30 \u591c380.9200.920Haidian\u00a0\/\u00a0XichengJishuitan\u79ef\u6c34\u6f6d\u00a02\u00a05 22 27 44 47 55 80 88 135 143 200 331 344 345 345\u5feb 347 380 409 508 604 618 620 625 670 872 877 883 885 886 889 919 919\u5feb \u89c2\u51493 \u591c2 \u591c4 \u591c20 \u591c36 \u591c38 \u4e1331 \u4e1351 \u4e131682.4503.370XichengPing’anli\u5e73\u5b89\u91cc\u00a04\u00a0 \u00a06\u00a03 4 7 13 22 38 42 47 88 105 107 111 118 143 409 \u591c3 \u591c4 \u591c10 \u591c21 \u591c361.5904.960Taipingqiao\u592a\u5e73\u6865\u00a01\u00a0 \u00a02\u00a0 (Out-of-system interchange via Fuxingmen)[14]7 10 15 38 47 52 88 \u591c1 \u591c362.7107.670Niujie\u725b\u8857\u00a07\u00a0 (Out-of-system interchange via Guang’anmennei)[14]5 6 10 38 48 50 57 88 109 381 \u591c7 \u591c23 \u4e13131.2409.810Jingfengmen\u666f\u98ce\u95e8\u00a014\u00a014 48 88 377 454 474 \u591c11 \u591c12 \u4e131552.96012.770FengtaiCaoqiao\u8349\u6865\u00a010\u00a0 \u00a0Daxing Airport\u00a0381 410 423 434 456 483 497 529 676 679 \u591c22 \u4e13179 \u4e132092.68015.450Xinfadi\u65b0\u53d1\u5730353 354 377 381 410 423 454 483 497 529 646 676 679 \u591c22 \u4e131902.65018.100Xingong\u65b0\u5bab\u00a0Daxing\u00a0343 353 354 369 474 556 827 829 946 954 \u4e1359 \u4e1367 \u4e131902.74020.840History[edit]It was reported in February 2012 as one of six new lines under planning by the city’s public transit planning authorities.[15] As of 2015, the line was renamed to Line 19[16] with the first phase starting construction in 2016.[5] The line opened on 31 December 2021.[10] Four infill stations opened on 30 July 2022.[11]Future development[edit]Phase 2 of Line 19, which is under planning, consists of a northern extension to Changping District. Additionally, there will be a branch line of the northern extension, which will serve the new Qinghe railway station, a station on the Beijing\u2013Zhangjiakou intercity railway.[17] On 11 January 2022, the second phase of Line 19 was listed as one of the 10 construction projects in the “Beijing Rail Transit Phase III Construction Plan (2022-2027)”.[18]In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022\u20132027) expanded the phase 2 planning. The northern extension will start from Mudanyuan and run to Life Valley as a 17.6\u00a0km (10.9\u00a0mi) long section with 6 new stations. A branch of the northern extension will run from Shangqingqiao South to Qinghe railway station for 6.8\u00a0km (4.2\u00a0mi) with one new station. Additionally, a southern extension was announced from Xingong to Haizijiao as a 12.6\u00a0km (7.8\u00a0mi) long section with 6 new stations along with a branch of the southern extension from Xinmeiti Chanye Jidi to Shengwu Yiyao Jidi West which will be 17.4\u00a0km (10.8\u00a0mi) long with 7 new stations.[19]References[edit]"},{"@context":"http:\/\/schema.org\/","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"item":{"@id":"https:\/\/wiki.edu.vn\/en\/wiki10\/#breadcrumbitem","name":"Enzyklop\u00e4die"}},{"@type":"ListItem","position":2,"item":{"@id":"https:\/\/wiki.edu.vn\/en\/wiki10\/line-19-beijing-subway-wikipedia\/#breadcrumbitem","name":"Line 19 (Beijing Subway) – Wikipedia"}}]}]