Line 19 (Beijing Subway) – Wikipedia

before-content-x4

From Wikipedia, the free encyclopedia

after-content-x4

Metro line of Beijing Subway

Line 19
BJS Line 19 icon.svg
19 007 reversing at Mudanyuan (20220107124954).jpg
Other name(s) M19 / R3 (planned name)
Status In operation
Termini
Stations 10
Type Rapid transit
System Beijing Subway
Operator(s) Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[1]
Depot(s) Xingong
Rolling stock 8-car Type A (CCD5034 and SFM80)
Opened 31 December 2021; 14 months ago (2021-12-31)
Line length 20.9 km (13.0 mi)[2]
Character Fully underground[3]
Track gauge 1,435 mm (4 ft 8+12 in)
Operating speed 100 km/h (62 mph) (Phase 1)[4]

Line 19 of the Beijing Subway (Chinese: 北京地铁19号线; pinyin: Běijīng Dìtiě shíjiǔ hàoxiàn) is a rapid transit line in Beijing. It is 20.9 km (13.0 mi) in length and has 10 stations.[2] It is fully underground.[3]

Description[edit]

Phase 1 of Line 19 begins at Mudanyuan station in Haidian District and ends at Xingong station in Fengtai District.[5] Phase 1 of Line 19 is 20.9 km (13.0 mi)[2] in length with 10 stations.[6] The line was envisioned as a major relief line for the overcrowded Line 4 and more direct link to the Beijing Financial Street commercial area.

The line uses 8-car type A rolling stock.[4][7]

after-content-x4

The trains have a maximum speed of 120 km/h (75 mph). However the speed limit of the first phase, which runs under the dense city center is 100 km/h (62 mph).[8][9] Phase II extensions north and south run through suburban areas and will be built to more generous alignments allowing for 120 km/h (75 mph) operations.

Opening timeline[edit]

Segment Commencement Length Station(s) Name
Mudanyuan — Xingong 31 December 2021[10] 20.9 km (13.0 mi)[2] 6 Phase 1
Beitaipingzhuang, Ping’anli, Taipingqiao, Jingfengmen 30 July 2022[11] 4 Infill stations of Phase 1

Stations (Phase I)[edit]

Station Name[12] Connections Nearby Bus Stops Distance
km[13]
Location
English Chinese
Mudanyuan 牡丹园  10  16 21 22 47 123 135 304 331 345快 425 508 510 579 601 606 618 620 645 653 658 夜4 夜9 0.000 0.000 Haidian
Beitaipingzhuang 北太平庄 16 22 47 88 123 135 300 300快 302 304 315 331 345快 361 368 387 425 508 510 579 604 606 618 620 645 671 694 695 847 883 885 886 889 921 夜4 夜30 夜38 0.920 0.920 Haidian / Xicheng
Jishuitan 积水潭  2  5 22 27 44 47 55 80 88 135 143 200 331 344 345 345快 347 380 409 508 604 618 620 625 670 872 877 883 885 886 889 919 919快 观光3 夜2 夜4 夜20 夜36 夜38 专31 专51 专168 2.450 3.370 Xicheng
Ping’anli 平安里  4   6  3 4 7 13 22 38 42 47 88 105 107 111 118 143 409 夜3 夜4 夜10 夜21 夜36 1.590 4.960
Taipingqiao 太平桥  1   2  (Out-of-system interchange via Fuxingmen)[14] 7 10 15 38 47 52 88 夜1 夜36 2.710 7.670
Niujie 牛街  7  (Out-of-system interchange via Guang’anmennei)[14] 5 6 10 38 48 50 57 88 109 381 夜7 夜23 专13 1.240 9.810
Jingfengmen 景风门  14  14 48 88 377 454 474 夜11 夜12 专155 2.960 12.770 Fengtai
Caoqiao 草桥  10   Daxing Airport  381 410 423 434 456 483 497 529 676 679 夜22 专179 专209 2.680 15.450
Xinfadi 新发地 353 354 377 381 410 423 454 483 497 529 646 676 679 夜22 专190 2.650 18.100
Xingong 新宫  Daxing  343 353 354 369 474 556 827 829 946 954 专59 专67 专190 2.740 20.840

History[edit]

It was reported in February 2012 as one of six new lines under planning by the city’s public transit planning authorities.[15] As of 2015, the line was renamed to Line 19[16] with the first phase starting construction in 2016.[5] The line opened on 31 December 2021.[10] Four infill stations opened on 30 July 2022.[11]

Future development[edit]

Phase 2 of Line 19, which is under planning, consists of a northern extension to Changping District. Additionally, there will be a branch line of the northern extension, which will serve the new Qinghe railway station, a station on the Beijing–Zhangjiakou intercity railway.[17] On 11 January 2022, the second phase of Line 19 was listed as one of the 10 construction projects in the “Beijing Rail Transit Phase III Construction Plan (2022-2027)”.[18]

In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) expanded the phase 2 planning. The northern extension will start from Mudanyuan and run to Life Valley as a 17.6 km (10.9 mi) long section with 6 new stations. A branch of the northern extension will run from Shangqingqiao South to Qinghe railway station for 6.8 km (4.2 mi) with one new station. Additionally, a southern extension was announced from Xingong to Haizijiao as a 12.6 km (7.8 mi) long section with 6 new stations along with a branch of the southern extension from Xinmeiti Chanye Jidi to Shengwu Yiyao Jidi West which will be 17.4 km (10.8 mi) long with 7 new stations.[19]

References[edit]


after-content-x4