[{"@context":"http:\/\/schema.org\/","@type":"BlogPosting","@id":"https:\/\/wiki.edu.vn\/en\/wiki24\/swinoujscie-lng-terminal-wikipedia\/#BlogPosting","mainEntityOfPage":"https:\/\/wiki.edu.vn\/en\/wiki24\/swinoujscie-lng-terminal-wikipedia\/","headline":"\u015awinouj\u015bcie LNG terminal – Wikipedia","name":"\u015awinouj\u015bcie LNG terminal – Wikipedia","description":"before-content-x4 From Wikipedia, the free encyclopedia after-content-x4 LNG terminal in Poland after-content-x4 The \u015awinouj\u015bcie LNG Terminal in 2018 A tanker","datePublished":"2016-08-06","dateModified":"2016-08-06","author":{"@type":"Person","@id":"https:\/\/wiki.edu.vn\/en\/wiki24\/author\/lordneo\/#Person","name":"lordneo","url":"https:\/\/wiki.edu.vn\/en\/wiki24\/author\/lordneo\/","image":{"@type":"ImageObject","@id":"https:\/\/secure.gravatar.com\/avatar\/c9645c498c9701c88b89b8537773dd7c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c9645c498c9701c88b89b8537773dd7c?s=96&d=mm&r=g","height":96,"width":96}},"publisher":{"@type":"Organization","name":"Enzyklop\u00e4die","logo":{"@type":"ImageObject","@id":"https:\/\/wiki.edu.vn\/wiki4\/wp-content\/uploads\/2023\/08\/download.jpg","url":"https:\/\/wiki.edu.vn\/wiki4\/wp-content\/uploads\/2023\/08\/download.jpg","width":600,"height":60}},"image":{"@type":"ImageObject","@id":"https:\/\/upload.wikimedia.org\/wikipedia\/commons\/thumb\/6\/60\/%C5%9Awinouj%C5%9Bcie_-_Gazoport_-_2018-06-02_16-33-02.jpg\/300px-%C5%9Awinouj%C5%9Bcie_-_Gazoport_-_2018-06-02_16-33-02.jpg","url":"https:\/\/upload.wikimedia.org\/wikipedia\/commons\/thumb\/6\/60\/%C5%9Awinouj%C5%9Bcie_-_Gazoport_-_2018-06-02_16-33-02.jpg\/300px-%C5%9Awinouj%C5%9Bcie_-_Gazoport_-_2018-06-02_16-33-02.jpg","height":"195","width":"300"},"url":"https:\/\/wiki.edu.vn\/en\/wiki24\/swinoujscie-lng-terminal-wikipedia\/","wordCount":1897,"articleBody":" (adsbygoogle = window.adsbygoogle || []).push({});before-content-x4From Wikipedia, the free encyclopedia (adsbygoogle = window.adsbygoogle || []).push({});after-content-x4LNG terminal in Poland (adsbygoogle = window.adsbygoogle || []).push({});after-content-x4The \u015awinouj\u015bcie LNG Terminal in 2018 A tanker docked at the terminal in 2020The \u015awinouj\u015bcie LNG terminal (also referred as Terminal LNG in \u015awinouj\u015bcie, Polskie LNG Baltic LNG, or gazoport) is a liquefied natural gas (LNG) import terminal at \u015awinouj\u015bcie, in the extreme north-west of Poland near the Polish-German border. The LNG terminal is operated by Polskie LNG S.A., a subsidiary of Gaz-System. The cornerstone for construction was laid on 23 March 2011 and it took its first LNG delivery on 11 December 2015.[1] The terminal’s regasification capacity is 5\u00a0billion cubic metres per annum (180\u00a0billion cubic feet per annum). The terminal is currently being expanded and once the expansion is complete in 2023, it will have a capacity of 7.5\u00a0billion cubic metres per annum (260\u00a0billion cubic feet per annum) and be able to satisfy about half of Poland’s annual natural gas demand. Together with the 10 bcm of natural gas that Poland will (starting in 2023) receive annually from Norway via the Baltic Pipe natural gas pipeline, the \u015awinouj\u015bcie LNG terminal will allow Poland achieve its long-term goal of becoming fully independent of Russian natural gas,[2] which had previously been the source of almost all of the country’s natural gas.Table of Contents (adsbygoogle = window.adsbygoogle || []).push({});after-content-x4History[edit]Technical description[edit]Expansion[edit]See also[edit]References[edit]External links[edit]History[edit] Construction of the \u015awinouj\u015bcie LNG terminal The terminal seen from the beach in 2014Discussions about the project started in 2006. The project was originally developed by PGNiG through its subsidiary Polskie LNG S.A. In January 2008, SNC-Lavalin was chosen for the front-end engineering design.[3] The engineering, procurement and construction contract was signed with a consortium of Saipem, Techint, Snamprogetti, and PBG.[3][4]Construction started in March 2011.[5] The first LNG delivery to the terminal is expected on 11 December 2015.[6]After creation of Gaz-System and its separation from PGNiG, the newly created company took over the ownership of Polskie LNG S.A. The terminal was inaugurated by prime minister Ewa Kopacz on 12 October 2015.[7]The gas carrier has delivered the first order on 11 December 2015.[1]The total cost of the terminal is \u20ac950\u00a0million (PLN 3.638 billion),[3] including PLN 888 million in grants, subsidies, and loans from the European Union.Technical description[edit] The terminal has unloading jetty for large LNG tankers, two storage tanks and regasification train. The terminal’s initial regasification capacity is 5\u00a0billion cubic metres per annum (180\u00a0billion cubic feet per annum), and this is expected to reach 7.5\u00a0billion cubic metres per annum (260\u00a0billion cubic feet per annum) in 2023 once its expansion is complete.Expansion[edit] Construction of the third storage tank in 2022In June 2020, Polskie LNG and the Szczecin and \u015awinouj\u015bcie Seaports Authority signed agreements with the consortium of PORR SA and TGE Gas Engineering GmbH for the expansion of the LNG terminal. The construction of the third tank will increase the terminal’s capacity from 5\u00a0billion cubic metres per annum (180\u00a0billion cubic feet per annum) to 7.5\u00a0billion cubic metres per annum (260\u00a0billion cubic feet per annum), satisfying approximately 50% of Poland’s annual gas demand. The agreements concern the expansion of the land and sea parts of the terminal. Polskie LNG will be responsible, inter alia, for the construction of a new LNG tank with a capacity of approximately 180\u00a0thousand cubic metres (6.4\u00a0million cubic feet) and construction of the technological part of the new ship berth for unloading, loading and bunkering LNG. Upon completion of the works, the nominal regasification capacity of the terminal will increase to 7.5\u00a0billion cubic metres per annum (260\u00a0billion cubic feet per annum). The construction of the third tank is expected to be completed by 2023 and will cost approximately PLN 1.9 billion.There is a plan to create a gas corridor from the \u015awinouj\u015bcie terminal to Adria LNG terminal in Croatia.[8]See also[edit]References[edit]External links[edit] Media related to LNG terminal in \u015awinouj\u015bcie at Wikimedia CommonsCoordinates: 53\u00b054\u203233\u2033N 14\u00b017\u203241\u2033E\ufeff \/ \ufeff53.90917\u00b0N 14.29472\u00b0E\ufeff \/ 53.90917; 14.29472 (adsbygoogle = window.adsbygoogle || []).push({});after-content-x4"},{"@context":"http:\/\/schema.org\/","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"item":{"@id":"https:\/\/wiki.edu.vn\/en\/wiki24\/#breadcrumbitem","name":"Enzyklop\u00e4die"}},{"@type":"ListItem","position":2,"item":{"@id":"https:\/\/wiki.edu.vn\/en\/wiki24\/swinoujscie-lng-terminal-wikipedia\/#breadcrumbitem","name":"\u015awinouj\u015bcie LNG terminal – Wikipedia"}}]}]