List of Ahmedabad Metro stations

before-content-x4

From Wikipedia, the free encyclopedia

after-content-x4

MEGA(Metro link Express form Gandhinagar to Ahmedabad)

Network Map of Ahmedabad Metro

This is a list of all stations of the Ahmedabad Metro, a rapid transit system serving Ahmedabad, India.

Ahmedabad Metro is the 12th metro system in India.

It was built and is operated by the Gujarat Metro Rail Corporation Limited. Its first section was inaugurated on 4 March 2019[1] and opened to the public on 6 March 2019, with the East-West Corridor.[2][3] The 1.4 km-long Thaltej-Thaltej Gam section and three metro stations will be completed by January-March 2023.[4][5][6] The rest of the Phase-1 was inaugurated on 30 September 2022.[7] The East-West corridor and the North-South corridor were opened to public on 2 October 2022 and 6 October 2022 respectively.[8]

after-content-x4

Metro stations[edit]

The list gives only operational stations, alphabetically-

Sr No. Station Name Line Opened Layout Platform Layout Notes Refs
English Gujarati
1 AEC એ ઇ સી  North-South Corridor  September 30, 2022 Elevated
2 Amraiwadi અમરાઈવાડી  East-West Corridor  March 4, 2019 Elevated Side [9]
3 APMC એ પી એમ સી  North-South Corridor  September 30, 2022 Elevated
4 Apparel Park † એપેરલ પાર્ક  East-West Corridor  March 4, 2019 Elevated Side [10]
5 Commerce Six Road કોમર્સ છ રસ્તા  East-West Corridor  September 30, 2022 Elevated
6 Doordarshan Kendra દૂરદર્શન કેન્દ્ર  East-West Corridor  September 30, 2022 Elevated
7 Gandhigram ગાંધીગ્રામ  North-South Corridor  September 30, 2022 Elevated
8 Gheekanta ઘીકાંટા  East-West Corridor  September 30, 2022 Underground
9 Gujarat University ગુજરાત યુનિવર્સિટી  East-West Corridor  September 30, 2022 Elevated
10 Gurukul Road ગુરુકુળ રોડ  East-West Corridor  September 30, 2022 Elevated
11 Jivraj Park જીવરાજ પાર્ક  North-South Corridor  September 30, 2022 Elevated
12 Kalupur Railway Station કાલુપુર રેલ્વે સ્ટેશન  East-West Corridor  September 30, 2022 Underground
13 Kankaria East કાંકરિયા પૂર્વ  East-West Corridor  September 30, 2022 Underground
14 Motera Stadium મોટેરા સ્ટેડિયમ  North-South Corridor  September 30, 2022 Elevated
15 Nirant Cross Road નિરાંત ક્રોસ રોડ  East-West Corridor  March 4, 2019 Elevated Side [11]
16 Old High Court જૂની હાઇ કોર્ટ  East-West Corridor  North-South Corridor  September 30, 2022 Elevated
17 Paldi પાલડી  North-South Corridor  September 30, 2022 Elevated
18 Rabari Colony રબારી કોલોની  East-West Corridor  March 4, 2019 Elevated Side [12]
19 Rajiv Nagar રાજીવ નગર  North-South Corridor  September 30, 2022 Elevated
20 Ranip રાણીપ  North-South Corridor  September 30, 2022 Elevated
21 Sabarmati સાબરમતી  North-South Corridor  September 30, 2022 Elevated
22 Sabarmati Railway Station સાબરમતી રેલવે સ્ટેશન  North-South Corridor  September 30, 2022 Elevated
23 Shahpur શાહપુર  East-West Corridor  September 30, 2022 Underground
24 Shreyas શ્રેયસ  North-South Corridor  September 30, 2022 Elevated
25 SP Stadium એસ પી સ્ટેડિયમ  East-West Corridor  September 30, 2022 Elevated
26 Thaltej થલતેજ  East-West Corridor  September 30, 2022 Elevated
27 Usmanpura ઉસ્માનપુરા  North-South Corridor  September 30, 2022 Elevated
28 Vadaj વાડજ  North-South Corridor  September 30, 2022 Elevated
29 Vastral વસ્ત્રાલ  East-West Corridor  March 4, 2019 Elevated Side [13]
30 Vastral Gam † વસ્ત્રાલ ગામ  East-West Corridor  March 4, 2019 Elevated Side [14]
31 Vijay Nagar વિજય નગર  North-South Corridor  September 30, 2022 Elevated

Statistics[edit]

Total number of metro stations 31
Number of interchange stations 1
Number of Elevated stations 27
Number of underground stations 4
Number of stations At-Grade 0

See also[edit]

References[edit]


after-content-x4